logo

商品の詳細

Created with Pixso. ホーム Created with Pixso. 製品 Created with Pixso.
粉のコーティング ライン
Created with Pixso.

After-sales Service Guide Equipment Installation and for Customized Powder Coating Line with Robot Polish Equipment

After-sales Service Guide Equipment Installation and for Customized Powder Coating Line with Robot Polish Equipment

ブランド名: CHG
モデル番号: AC09
MOQ: 1セット
価格: 100,000-300,000 USD
支払条件: L/C、D/A、D/P、T/T、ウェスタンユニオン、マネーグラム
供給能力: 年間10セット
詳細情報
起源の場所:
中国
証明:
CE, ISO
型番:
AC09
基板:
鋼鉄
コントロールユニット:
PLC
ミニオーダー数量:
1セット
サイズ:
カスタマイズされた
技術データ:
カスタマイズされた
輸送パッケージ:
カスタマイズされた
アフターサービス:
機器の設置と使用をガイドします
パッケージの詳細:
デザインによって異なります
製品の説明
This powder coating production line is designed for spraying carbon steel sheets of various dimensions and shapes used in safes.
The spray booth is constructed with PVC panels, and the coating application combines both automatic spray guns and supplementary manual touch-up spraying. The pretreatment section runs on a skid-type ground conveyor, while the powder coating section operates on an overhead conveyor system that maintains a constant conveying speed.

Production Line Workflow

1. Welding Area Loading

A robotic manipulator places the cabinet body and door panel onto two independent work positions.

2. Metal Grinding

  • A robotic grinding unit polishes the weld seams on the cabinet body.

  • Door panel weld seams are manually polished, followed by full-surface manual sanding to ensure a smooth finish.

3. Phosphating Solution Treatment

Operators manually wipe the surfaces with a phosphating agent to improve coating adhesion and corrosion resistance.

4. Moisture Drying

The treated workpieces are dried at 40–50°C to remove any remaining moisture.

5. Manual Putty Application

Technicians apply putty to fill surface imperfections and ensure surface flatness.

6. Putty Drying

The putty layer is dried at 40–50°C to achieve proper hardness.

7. Manual Putty Sanding

After curing, the putty is manually sanded to obtain a uniform, smooth finish.

8. Workpiece Accumulation

Finished parts are accumulated—approximately 100 sets—before entering the next stage.

9. Mechanical Loading Transfer

The accumulated workpieces are automatically transferred to the next process via mechanical loading equipment.

10. Dust Removal

Operators use electrostatic dust blow guns to remove dust and fine particles from the surface.

11. Powder Coating Application

A combination of automatic spraying and manual reinforcement is used to ensure full and even coverage.

12. Powder Curing

The coated parts are cured at 200°C for 18 minutes, allowing the powder coating to fully crosslink and solidify.

13. Air Cooling

After curing, parts undergo forced air cooling to stabilize the coating.

14. Manual Installation of Casters

Casters are manually attached to the finished cabinet bodies.

15. Assisted Downloading to AGVs

Using human–machine collaborative handling, the completed units are placed onto AGV carts for transfer to the next workstation.



After-sales Service Guide Equipment Installation and for Customized Powder Coating Line with Robot Polish Equipment 0

After-sales Service Guide Equipment Installation and for Customized Powder Coating Line with Robot Polish Equipment 1

After-sales Service Guide Equipment Installation and for Customized Powder Coating Line with Robot Polish Equipment 2